PROJECT CONCERNS
This project required a large reserve of resin on the pump truck due to the scale of the bridge. E-Chem provided enough material to complete over 2,000 SY in a single shift without reloading. The contractor was able to install an average of 10,000 sf/hr. with the pump shown and a crew of 6 installers. This bridge was completed in two single shift days allowing the contractor to complete this project ahead of schedule.
EPX-50 HIGHLIGHTS
- 100% SOLIDS
- Low Odor
- WORKER FRIENDLY
- EASY 1:1 RATIO
- LOW MODULUS
- RAPID TURNAROUND
- WATERPROOF
- MOISTURE INSENSITIVE
- SELF-PRIMING

PROJECT RESULTS
- Bridge installation completed in two shifts, cleanup completed prior to dark.
- Increased project profitability due to solutions oriented approach.
- Reduced worker exposure to hazardous traffic conditions.
- High volume, high accuracy epoxy placement.